Potable Water :
First stage to irrigate the green area of the new cairo city :
Project Description:
Irrigation pipeline for WWTP of Ein El Sokhona to grean areas in new Cairo city ( R.C., of 1000 mm dia.,11.2 km long, U.P.V.C pipelines from ( 400 mm to 500 mm dia., 19 km long And 30.2 Km. Total length)
Pipe jacking under road crossing 120 m long for EL - Katamia , EL Ain EL - Soukhna road of R.C. pipe of 3.2 m dia. To pass DI line 1000 mm dia.
Project value & Date:
- The Value of contract is 41292256.22 EGP
- The Contract Date 20/06/2005
- The End Date 24//3/2008