Potable Water :
Intake and twin raw water pipeline in New Assuit City :
Project Description:
- Water Intake :
- Water Sump, Dia. 19m.and subsidiary buildings.
- Raw and filterated water pipelines from 600 : 800 mm dia. And 13.7 Km total
length.
- Crossings :
- Mini tunnel under AlKady canal ( Misr - Aswan ) road 2.5 m dia. And 87.5 km
length by hydraulic pushing system to pass pressurised steel pipeline 800 mm
dia.
Project value & Date :
- The Value of contract is 34 million EGP
- The Contract Date 30/08/2003
- The End Date 20/8/2006