Waste Water Disposal :
Execution of first portion of diversion works of Infrastructure obstructing with first stage of the Third Line of Cairo Underground Metro :
Project Description:
- Potable Water Works:
-transfer DI water pipeline 600 mm dia.,0.750 km.
- D.I. pipelines of 100 : 600 mm dia. and 4.839 km long.
- Wastewater Works :
- Hydrulic Jacking of R.C pipeline 2250,1500 mm dia. And 355, 0.816 km long.
- DI pipeline 1000 mm dia. , 30 m long (open cut excavation).
- VC pipelines 7' : 20' dia., 2.654 km long.
- UPVC housing connections150,200 mm dia.,0.150 km long
- Electrical :
- Supply and lay of 7.409 km long cables.
- Telephon works:
- Supply and lay of PVC conduit of 13.400 km long.
Project value & Date:
- The Value of contract is 31.5 million EGP
- The Contract Date 30/11/2005
- The End Date 30/6/2008