Waste Water Disposal :
Wastewater Disposal for Namera EL Basal village - EL Mahala El Kobra :
Project Description:
- Gravity Networks:
- V.C pipelines 15" : 24" dia. And total length 2 km.
- U.P.V.C pipelines 160 mm : 250 mm dia. And total length 13.646 km.
- Pressurized pipelines
- Polyetheline pipelines 300 mm dia., 3.5 km long.
- Pump stations:
- One Main P.S
- One Secondary P.S
- Wastewater Treatment Plant 10000 m3/day.
Project value & Date:
- The Value of contract is 20 million EGP
- The Contract Date 10/12/2002
- The End Date 30/6/2010