Waste Water Disposal :
Wastewater Disposal for ( Koufour Belshay , Benofer , Asdeema and Koulaib Abiar ) Kafr El Zayat center
Project Description:
Gravity networks
- V.C pipelines from 15 u : 36 u , 18.15 km long.
- UPVC pipelines from 6" : 12" 17.6 km long.
- Pump stations
- Pressurized pipelines
Project value & Date:
- The Value of contract is 57 million EGP
- The Contract Date 20/12/2004
- The End Date 30/6/2012