Chairman Message
History & Milestone
Vision & Mission
Fields Of Interest
Board Of Directors
Organization Chart
Employee Benefits
Contact Us
Annual Reports
Company Performance
Quarterly Financial Positions
Share Holders
Refrance Banks
Waste Water Disposal
Potable Water
Roads & Bridges
Electrical Power
Industry & Public Buildings
Housing & Tourist Villages
Kingdom of Saudia Arabia
United Arab Emirates
Sultanate of Oman
Republic of Algeria
State of Kuwait
Libyan Arab Jamahiriya
Earthy works Equipment
Concrete Works Equipment
Lifting Equipment
Miscellaneous Equipment
Customers
Consultings
Suppliers
Subcontractors
Home Contact Us News Sitemap Legal help
United Arab Emirates : A Dual water Transmission line from Fujairah to Al Hayer Tank Compound Project Description:
Scope of Work briefly shall include but not limited to Engineering, Design, Supply of Materials and Equipment, Construction, Installation, Testing, Pre-commissioning, Commissioning, Handover and warrant the works during the maintenance as follows:
  1. 11.3 km Twin DN 1600 CS Transmission from Fujairah (FWTS) at Tap-off 9A to the proposed Al Hayer Tank Compound (working pressure 20 bar) with associated chambers and equipment.

  2. Dual fiber optic cables along the pipeline route

  3. The Al Hayer Tank Compound comprise of two welded steel tanks of 25 MIG (113650 m3) capacity each with associated pipeworks, chambers, overflow lagoon and site works. All mechanical, electrical, instrumentation & control/SCADA equipment, new chlorination facilities for production, storage and dosing of hypochlorite solution, power supply. Control room, all ancillary equipment. Pipeline diversions. Piping valves, air conditioning, workshop, roads, boundary walls, drainage system overflow tank, site works and side slope protection etc.
Project value & Date:
- The Value of contract is 509 million AED
- The Contract Date 25/02/2008
- The End Date 24/02/2010