Chairman Message
History & Milestone
Vision & Mission
Fields Of Interest
Board Of Directors
Organization Chart
Employee Benefits
Contact Us
Annual Reports
Company Performance
Quarterly Financial Positions
Share Holders
Refrance Banks
Waste Water Disposal
Potable Water
Roads & Bridges
Electrical Power
Industry & Public Buildings
Housing & Tourist Villages
Kingdom of Saudia Arabia
United Arab Emirates
Sultanate of Oman
Republic of Algeria
State of Kuwait
Libyan Arab Jamahiriya
Earthy works Equipment
Concrete Works Equipment
Lifting Equipment
Miscellaneous Equipment
Customers
Consulting
Suppliers
Subcontractors
Home Contact Us News Sitemap Legal help
United Arab Emirates : Taweelah - Unit III - Umm Al Nar Water Transmission Scheme. Project Description:
The Complete project works may be summarized as the following:
  1. One DN 1600 D.I. Pipeline running from the new Power and Desalination Plant at Taweelah to the Intermediate Pumping Station at Unit III.
  2. Laying 5.2 km of DN 1200 D.I. Pipeline to replace existing sections of pipeline between Taweelah and Unit III that are to be removed.
  3. Construction of 4 x 10 MIG concrete storage reservoirs at Unit III complete with all associated works and appurtenances and interconnections with existing reservoirs.
  4. A new 76 MIGD pump station within Unit III pumping station complex.
  5. One DN 1600 D.I. Pipeline from Unit III new pump station up to Umm Al Nar junction including connection to existing 5 x DN 900 pipelines from Umm Al Nar pumping stations and the DN 1000 pipeline from Unit III towards Umm Al Nar.
  6. Fibre optic cable along the pipeline route for SCADA application.
  7. Providing the interfacing requirement at the PS battery limit only as per the agreed operation and control philosophy and protocol for data exchange with the WMS consultant. Implementation of integrated operation from Level III and Level IV is not covered in the present scope of the Contract. However, provision for control of the station from Level III will be provided in the control system.
Project value & Date:
- The Value of contract is760 million AED
- The Contract Date 11/04/2006
- The End Date until now