Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater disposal of 2 villages at AL-Ayat ( Meet Al-Qaid & Tahma )

Project value & Date:

  • The Value of contract is 50 Million EGP
  • The Contract Date 4/13/2009
  • The End Date 12/31/2023

Project Description:

** Gravity network:
* UPVC pipelines of 150 : 300 mm dia. & 23.7 km total length.
* HDPE pipelines of427  mm dia. &2.6 km total length.
* R.C pipelines of1200 mm dia. & 0.81 km total length.
** Pressurised pipeline
* HDPE pipeline of 500 mm dia. & 3.1 km length.
* R.C. pipeline of 800 mm dia. &2.7 km length.
** 2 nos. Pump station - meet el kaaed plant  discharge 140 L / sec dia 5 m height 12 m  
*tahma plant : dia 14 m height 22 m discharge 560 L / sec  
* 2nos mini tunnels Crossings
* meet el kaaed crossing of pressurized pipelines under the rail way ,canal and Misr - Assiut agricultural road of dia 1500 mm to pass DI of dia 500 mm with total length 50 m
* Tahma crossing of gravity pipeline under giza canal and el masnada drain dia 3200 mm to pass DI 1200 mm with total length 100 m 