Société Egyptienne D’entreprises

Roads, Bridges, Land Reclamation and Irrigation :

2nd stage of( Motobus - Abu El-Rous -Fowa) highway in Kafr Elsheikh Governorate (B)

Project value & Date:

  • The Value of contract is 2477.774541 Million EGP
  • The Contract Date 6/6/2022
  • The End Date 12/31/2025

Project Description:

A road from Abu Elroos tributary to Motobas , 10.260 km long and 21 m width ,containing two trafific lanes in both direction sides and middle median at both sides of the roads 
* 15  overfly and surface bridges, total length 5.596 km 
* 1 tunnel 30 m length 
* sewage and irrigation crossing under the road (R.C pipeline 893 m length and 300 : 1200 mm dia., P.E. pipeline 8133 m length and 300 : 700 mm dia.) 