Design and Execution of the intake and raw water pipeline and the 1st. Stage of potable water purification plant (25000 m3/day) at New Souhag City (Al Kawamel)
Construction of 2 Ground reservoirs, an elevated tank and water Transmission pipelines to be connected to the main pipelines - 6 th District - Bourg El Arab City