* Pipe network for 5 berft villages (Faied - Fanara - Hawise - Sarabium - Abo Tofaila - Al Baiadia) * HDPE pipes from 300 : 500 mm dia & total length 61.88 km. * UPVC pipes from 100 : 200 mm dia.& total length 131.60 km. * 4 nos. Crossings over canals. * 41 nos. Crossings over drains. * 5 nos. Railway Crossings (open cut excavation).