Housing & Tourist Villages and their Utilities :

Infrastructure and Roads for Smart Village (Second Stage) , El-Sheikh Zayed City.

Project value & Date:

  • The Value of contract is 62.462193 Million EGP
  • The Contract Date 5/10/2003
  • The End Date 9/28/2006

Project Description:

Potable Water Network:-
* DI PIPELINES dn(200:400) mm & total length 2.257 km.
* upvc pipeline DN(63:315) mm & total length 12.325 km.
Sewerage Network:-
* upvc gravity pipelines DN(160:400) mm & total length 8.221 km.
Pressurized pipeline:-
* DI pipeline DN(300-350) mm & total length 1.996 km.
Surface Drainage System :
* upvc pipeline DN 160 mm
Road Netwrok (total area 155000 m2).
Fire fighting networks.
Electrical Network.
Pipeline network for Telephone Cables.
Main Irrigation Network.
Service Buildings. 