Infrastructure Works (Potable water - Wastewater - Roads - Irrigation) for the extention of the Industrial Zone -1 st. stage (Al-Emarate Zone S8) in Sadat City
* Sewage Networks using UPVC pipelines 200 : 400 mm dia. & 12.5 km length.
* Water Networks using UPVC pipelines 160 : 500 mm dia. & 15.9 km length.
* Roads (sublgrade layer) only 12.8 km length.