Société Egyptienne D’entreprises

Waste Water Disposal :

Complementary wastewater disposal for EL Ayatt city

Project value & Date:

  • The Value of contract is 193.999993 Million EGP
  • The Contract Date 1/15/2002
  • The End Date 6/30/2024

Project Description:

** Gravity Networks :
* V.C. pipelines from 8" : 36" dia. And 33 km length.
** Pressrized Pipelines:
* P.S.R.C. of 800 mm dia. And 7.2 km total length.
* HDPE of 560 mm dia. & 0.61 km Length.
* Water treatment plant discharge 28000 m3/day 
** Pump stations :
* Two pump stations ( main with dia 16 m &height 18 m discharge 800 L/sec and subsidiary of dia 12 m &height 12 m discharge 160 L/sec )
Crossings :
*2 Mini tunnels for gravity network under Misr - Assiut agricultural road.
R. C culvert  of 2250 mm dia. To pass D.I pipeline of 900 mm dia. And 50 m.Length.
R.C culvert  of 1500 mm dia. To pass D.I pipeline of 400 mm dia. And 39.3 m.Length.
* Mini tunnel under railway (Misr - Aswan ).
R.C culvert  of 1800 mm dia. To pass D.I pipeline of 500 mm dia.And 59 m Length.
* Mini tunnel under (El-Gezawi canal & El moheet drain) R.C pipes of 2250 mm dia. To pass DI pipeline of 800 mm dia. And 525 mm and 130 m length.
* Mini tunnel under (Misr-Aswan/Railway ) R.C pipes of 36" mm dia. To pass DI of 900 mm dia. & 525 m length.
*4 open cut excavations PSRC  of 800 mm and 90 m total length 