Potable Water :

Complesion of Dual GRP Transmission pipeline 700 mm dia. & 35 km length among extention of Al Kuraimat pipeline

Project value & Date:

  • The Value of contract is 96.078619 Million EGP
  • The Contract Date 8/22/2012
  • The End Date 2/18/2015

Project Description:

* extension works for el korimat GRP  pipelines with 35 km length.
* No.3 open culverts ,240 m long.
* Vaves Room 