Société Egyptienne D’entreprises

Waste Water Disposal :

Complation of Wastewater for Nazaly Ganoup Village Connecting it to Sewage treatment plant El - Kossia city

Project value & Date:

  • The Value of contract is 311.989161 Million EGP
  • The Contract Date 12/18/2004
  • The End Date 6/30/2025

Project Description:

* Gravity Networks
P.V.C pipelines of 160 : 300 mm & total length 23.22 km.
V.C pipelines of 375 : 700 mm & total length 1.28 km.
* Pressurized Pipelines
pipeline of 500 mm dia. & 3.5 km length.
* Crossings
1 No. mini tunnel of total length 110 m.
3 Nos. open cut excavation of 20 m length each.
* Pump Station . 