Société Egyptienne D’entreprises

Housing & Tourist Villages and their Utilities :

Infrastructure for 6th of October Cooperative Committee - Sheikh Zayed + operation and maintainance

Project value & Date:

  • The Value of contract is 28.48076 Million EGP
  • The Contract Date 3/4/2000
  • The End Date 5/13/2003

Project Description:

 Wastewater System :
  * U.P.V.C. pipelines of 150 : 300 mm dia. and 33 km total length.
  * V.C. pipelines of 500 : 600 mm dia. and 0.8 km total length.
Potable Water and Fire pipe fitting Network :
  * D.I. pipelines of  100 : 250 mm dia. & 24.3 km total length and 10 bar working pressure .
  * Galvanized  Steel pipelines of  37 : 50 mm dia. &12 km total length and 10 bar working pressure .
  * U.P.V.C. pipelines of 150 : 300 mm dia. & 12.8 km total length and 10 bar working pressure . 
  * U.P.V.C. pipelines of 450 mm dia. & 4.8 km total length and 10 bar working pressure . 
Road Works :
 * Main and subsidiary roads of 12 : 28 m width and 21.3 km length.
Electrical and Telephone works:
 * Networks, Distributors and lighting posts.
 * Law volt network .
 * Mid volt network .
 * Road lighting network .
General building :
 * Administration building (ground+first floors) 