Société Egyptienne D’entreprises

Housing & Tourist Villages and their Utilities :

Infrastructure for 15 th. of May City Stage (2) and Stage (3) and Pressurized pipeline and Wastewater Treatment Plant

Project value & Date:

  • The Value of contract is 99.325484 Million EGP
  • The Contract Date 3/15/1983
  • The End Date 6/30/1997

Project Description:

Sanitary Wastewater System :
   Gravity Network :
   * V.C. pipelines of 7" : 32" dia. and 94 km total length.
   * G.R.P. pipelines of 500 : 1400 mm dia. and 3.2 km total length.
Pressurized pipeline :
   * Ductile cast iron pipelines of 500 : 600 mm dia. and  5 km total length.
Sewage treatment plant of 30000 m3/day discharge.
   * Construction of screw lifting pump station contained 4 pumps of 180 L/s discharge each  , 2.445 m head and France made.
Potable Water Network :
   * Asbestos pipelines of 100 : 500 mm dia. and  54 km total length.
   * Ductile cast iron pipelines of  600 : 1000 mm dia. and 6 km total length.
   * Galvanized steel pipelines of  125 : 1000 mm dia. and 3.5 km total length.
   * Steel pipelines of  400 : 1000 mm dia. and 2.5 km total length.
Electricity : 
Cables , cabinets, transformer and lighting poles . 