Project value & Date:

  • The Value of contract is 2000 Million EGP
  • The Contract Date 6/30/2021
  • The End Date 6/30/2024

Project Description:

* Wastewater sector works:
 1st stage :
A wastewater  treatment plant of   20000 m3/day capacity using Oxidation Ponds( 2 non-aerial basins - 2 pulsating basins- 6 maturation basins)on 2 sections
2nd stage:
* upgrade to 3000 m2/d ,contains 5 basins (1 non-aerial basins- 1 pulsating basin - 3 maturation basins)and seapage lines.
wastewater networks for 12 village 342 km length
* 20 sewage pump stations + 20 pressurized pipeline
* Electricity Networks
  Supporting  networks  for 3 village networks.
* Potable Water Network
  Supporting of potable water  networks  of   192 km length
* Health sector works:
Construction of ambulance station
* Service sector works
Construction of 10 complexes (5 citizens service complexes + 5 agricultural complexes) 