Waste Water Disposal :

Main Double complex System from ELKhosos to ELGabal ElAsfar

Project value & Date:

  • The Value of contract is 293.802025 Million EGP
  • The Contract Date 6/17/2003
  • The End Date 6/30/2021

Project Description:

ٌReinforced Concrete tunnel of three vents each 3.5 * 3 m section and  8.1 Km total length and has internal lining of blue bricks and anti Acid resistant epoxy material with an anti volatile material of PVC sheets against vapour, for the ceiling.
Including connection rooms and maintenance openings . 