Société Egyptienne D’entreprises

Waste Water Disposal :

Completion of Shatura wastewater disposal-Tahta district

Project value & Date:

  • The Value of contract is 165 Million EGP
  • The Contract Date 11/7/2021
  • The End Date 6/30/2025

Project Description:

* 2 pump stations (Main pump station+Secondary pump station) + Two Pressurised Pipelines + Gravity Network UPVC & VC pipelines 8":24" with 32 km length.
* Pressurised Pipeline GRP 800 mm dia and 13 km length for main pump station
* Pressurised Pipeline HDPE 400 mm dia and 800 m length for secondary pump station 