Project Description:
* Two construction stages for potable water Purification plant of total discharge (17000 m3/day each stage ) :
* Row water pump house .
* Distribution tank .
* Quick mix tank .
* Clarifier .
* 8 filters .
* Ground reservoir of 4000 m3 capacity.
* Treated water pump house .
* Chlorination storage .
* Alum storage tanks .
* Slidge tank .
* Generator building .
* Work shop building .
Water Tanks :
* Three R.C. elevated tanks of 1000 m3 capacity each and from 35 to 42.5 m height .
Potable Water Networks :
* Asbestos pipelines of 200 : 400 mm dia. and 32.7 km total length.
* Ductile cast iron pipelines of 200 : 700 mm dia. and 13.5 km total length .
* Steel pipelines of 200 : 1000 mm dia. and 2.1 km total length .
* R.C. pipelines of 800 : 1000 mm dia. and 0.3 km total length .