Société Egyptienne D’entreprises

Housing & Tourist Villages and their Utilities :

Infrastructure for New Domiatta city

Project value & Date:

  • The Value of contract is 78.261371 Million EGP
  • The Contract Date 1/28/1985
  • The End Date 7/28/2004

Project Description:

Wastewater  Disposal :
Gravity Network :
  * G.R.P. pipelines of 200  : 600 mm dia. and 1.8 km length.
  * P.V.C pipelines of 150  : 300 mm dia. and 53.4 km length.
  * R.C pipelines of 900  : 1500 mm dia. and 1.3 km length.
Pressurized pipelines :
 * G.R.P. Pressurized pipelines of 200 : 600 mm dia. &4.2 km length and 6 bar working pressure.
 * P.V.C. Pressurized pipelines of 200 mm dia. & 3.4 km length and 6 bar working pressure .
 * Ductile cast iron Pressurized pipelines of 200 mm dia. & 3.2 km length and 12 bar working pressure .
Pump Stations :
 * Four  pump stations of 40 to 250 L/sec discharge .
 * Pump station No ( 1 ) of 120 L / sec discharge .
 * Pump station No ( 2 ) of 240 L / sec discharge .
 * Pump station No ( 3 ) of 250 L / sec discharge .
 * Pump station No ( 4 ) of 40 L / sec discharge .
Potable Water Network :
 * Potable water  network of  P.V.C. pipelines of 100 : 300 mm dia. & 82 km length and 6 bar working pressure.
 * Potable water  network of G.R.P. pipelines of 500 mm dia. & 5.5 km length and 6 bar working pressure.
 * Potable water network of galvanized steel pipelines of 125 mm dia. & 5.2 km length and 9 bar working pressure.
Elevated Water Tank :
 * One R.C. elevated water tank of capacity 700 m3 and 47 m heigh in the city center .
Roads Works :
 * Main and subsidiary roads of  34.3 km total length and  4  to 10 m wide.
Electrical Works :
 * Elecricity cables of 391.7 km length  and 1300 No. of lighting pols.
 * Telephone cables of 34 km. total length 
    . 