Société Egyptienne D’entreprises

Housing & Tourist Villages and their Utilities :

New Menia City

Project value & Date:

  • The Value of contract is 85.340464 Million EGP
  • The Contract Date 5/26/1986
  • The End Date 7/16/2005

Project Description:

Gravity Network :
   * V.C. pipelines of  9" : 24" dia. and 16.2 km total length.
Pump Stations :
   * Main pump station of 500 L/sec discharge.
   * Subsidiary Pump station of  30 L/sec discharge.
Pressurised Lines :
   * Ductile cast iron pipelines of  200 : 600 mm dia. & 5.2 km total length and 9 bar working pressure .
Wastewater Treatment Plant :
   * Five Oxidation ponds.
Potable Water Network :
   * Ductile cast iron pipeline of 700 mm dia. & 1.4 km length and 9 bar working pressure .
   * Asbestos pipelines of   500 : 600 mm dia. & 2.5 km total length and 6 bar working pressure .
   * P.V.C. pipelines of 150 : 300 mm dia. & 12.3 km total length and 6 bar working pressure .
Elevated Water Tanks :
   * One elevated R.C. potable water tank of 1000 m3 capacity.
Roads :
   * Main roads of 4.5 km length and 40 m wide.
   * Subsidiary roads 15 km length and 20 m wide.
Buildings :
   * 460 residential units.
Electricity :
   * Electrical network including distributers and illumination network. 